Aligning With the Action Plan Timeline

Yayın Tarihi: 28 Ağustos 2026 Yazar: Gürbüz Özdem Kategori: Tips
Aligning With the Action Plan Timeline — Adapte Dijital cover image
💡 Kısaca: The state’s AI calendar has two gears: build first, scale second.

The state’s AI calendar has two gears: build first, scale second. Your business calendar should too — and when you lay the two on top of each other, what to do when becomes self-evident. Türkiye’s AI Action Plan phases its period explicitly: governance structures, data-space pilots, public applications and compute investment decisions in the early years; scaling, commercialisation of sectoral models and export in the later ones — with a note that early-maturing actions scale without waiting for the calendar.

Most businesses never read the phasing and fall into one of two errors: assuming everything is ready now and souring early, or assuming everything is distant and sleeping for five years. This piece builds the third way: gearing your own transmission to the state’s.

WHAT

What Is the Problem?

BU BÖLÜMÜN ÖZETİ

  • Early expectation breeds early resentment
  • Late awakening pays for an expensive place in the queue
  • The internal and external calendars run separately

Living unaligned carries three costs.

Early expectation breeds early resentment

The business that knocks on every door the week the plan is published finds most programmes still under construction — and walks away muttering “all talk.” The resentful business is absent from the table when the programmes genuinely open. Yet what it witnessed was not delay but phasing: expecting calls in the build year is demanding rent from a building whose foundation was just poured.

Late awakening pays for an expensive place in the queue

The opposite business says “plenty of time” and enters the scale phase unprepared: quotas filled, first-wave references distributed, consultant prices risen. Every incentive era draws the same curve — the early-prepared buy cheap, the late buy dear. And preparation itself takes time: data order, team capability and a document file are not assembled in a week.

The internal and external calendars run separately

A business’s own AI plan — pilots, purchases, hires — is usually drawn without reference to the outside world. The result is double waste: money spent on capacity the state was about to subsidise, or work postponed “to catch the support” that misses its market window instead. Running two calendars separately is burning fuel twice on the same road.

WHY

Why Does It Happen?

BU BÖLÜMÜN ÖZETİ

  • Phasing is the document’s least-quoted section
  • Business plans ignore public calendars by habit
  • Uncertainty gets promoted into an excuse

Misalignment has three roots.

Phasing is the document’s least-quoted section

Headlines carry the numbers; the calendar paragraphs beginning “In the first period…” never make the news. Only document readers know the phasing — one more proof of why the reading session is not optional.

Business plans ignore public calendars by habit

Everyone folds exchange rates, interest expectations and sector trends into the annual plan; almost nobody folds in the public programme calendar. The reason is habit: the public sector lives in the “apply if we get around to it” category, never as a planning input. A five-year, budgeted, publicly monitored action plan does not deserve that habit.

Uncertainty gets promoted into an excuse

“The calendar will slip anyway” is a correct observation tied to a wrong conclusion: since it slips, let’s not plan. Slippage is not planning’s cancellation; it is one of its parameters — the buffer. No shipyard stops building because the harbour’s opening might delay; it adds margin to the delivery date.

HOW

How Is It Done?

BU BÖLÜMÜN ÖZETİ

  • Step 1: Translate state phases into business phases
  • Step 2: Sort your own work onto three shelves
  • Step 3: Add one alignment question to the quarterly routine

The alignment builds in three steps, on one page.

Step 1: Translate state phases into business phases

The state’s build phase = your preparation phase: data order, baseline team capability, a first small pilot, and the document file (including the tech-startup certificate — the public procurement window requires it). The state’s scale phase = your application and growth phase: GPU credits, vouchers, sector pilots, catalogue opportunities. The whole method fits one sentence: while the state builds, you prepare; when the state opens, you apply.

Step 2: Sort your own work onto three shelves

Every AI initiative you are considering goes on one of three shelves. The NOW shelf: work independent of any public calendar — data cleaning, decision sentences, team learning; these wait for no call because they are every call’s prerequisite. The TIME-IT shelf: work that public money will make cheaper — large model experiments timed to GPU credits, a sector pilot timed to its call. The LATER shelf: work built on the scale phase’s products — data library sets, catalogue solutions, export packages. The sorting takes half an hour and answers “why now / why not” for every initiative, permanently.

Step 3: Add one alignment question to the quarterly routine

Your monitoring rhythm gains a single question: what moved on the state’s calendar this quarter, and what should move on our shelves? An action pulled forward pulls its TIME-IT work forward; a delayed action sends its dependent work either to waiting or to your own budget. The alignment is not a picture drawn once; it is a mirror checked quarterly.

HOW

How Long, at What Cost?

BU BÖLÜMÜN ÖZETİ

  • One afternoon to set up
  • The return pays in two currencies
  • Its biggest cost is zero: a no-waiting guarantee

The economics match any one-page planning tool.

One afternoon to set up

The phase translation and three shelves build in two hours from the reading session’s outputs. With the three-column note page in hand, the work is just converting a page into a calendar.

The return pays in two currencies

Direct savings first: every piece of work timed to public funding cuts what your own budget would have carried. Opportunity revenue second: the business that finishes preparation on time sits at the table for the scale phase’s first wave — and the first wave is where the references and quotas get distributed.

Its biggest cost is zero: a no-waiting guarantee

The hidden value of the sorting is the NOW shelf: it guarantees that nothing stalls under “waiting for the state.” The public calendar is a tailwind, not the transmission — the engine is yours.

THE

The Common Mistake

BU BÖLÜMÜN ÖZETİ

  • Piling the whole plan onto the TIME-IT shelf
  • Skipping preparation and jumping to application
  • Aligning once and forgetting

Three traps wait at the alignment table.

Piling the whole plan onto the TIME-IT shelf

The promise of subsidy seduces; initiative after initiative slides to “let’s wait for the call,” and the business effectively stops. The rule is firm: if a piece of work’s competitive value exceeds its waiting cost, you do it now with your own money. Support is a subsidy for work worth doing — never a reason work goes undone.

Skipping preparation and jumping to application

The scramble to assemble a file once a call opens is unpreparedness’s invoice: a hastily written project, an application propped on messy data, a pilot promised to an untrained team. What is lost is not just that call; it is the impression left in the evaluator’s memory. The preparation phase can be compressed — never skipped.

Aligning once and forgetting

Annual implementation plans will shift; early-maturing actions will jump the queue — the plan says so upfront. An unmirrored alignment goes stale in six months. The single quarterly question is the antidote; a shelf without its question is a shelved plan.

FREQUENTLY

Frequently Asked Questions

Sık Sorulan Sorular

Isn’t tying our plan to a five-year state plan risky?

Tying would be; aligning is not. The difference: a tied plan stalls when the state delays; an aligned plan carries two routes for every initiative — TIME-IT work whose call slips either waits or reverts to your own budget, and the choice stays yours. The state calendar is not your plan’s mast; it is its wind. Blowing your way, you speed up; absent, the oars are still in your hands.

We are a micro business — is this alignment meaningful at our scale?

The smaller the scale, the simpler the alignment and the greater its value — because a micro business’s own capital is scarce, and catching public funding turns undoable work into doable work. At micro scale the three shelves shrink to three sticky notes: data and learning now, GPU and voucher at the call, ready catalogue solutions later. Three notes manage five years.

What if the plan’s targets fail — does this effort evaporate?

The sorting’s elegance answers exactly that: everything on the NOW shelf — ordered data, a trained team, a written decision routine — remains the business’s own property whether or not the state opens a single door, and holds its value in the open market. If the TIME-IT shelf disappoints, the loss is the delay cost of a few postponed initiatives — bounded by the quarterly mirror. Even the bad scenario leaves the preparation in your vault: the very definition of a titled asset.